Would you like to receive parts as an assembled module or finished product? During assembly in China TOS coordinates the production of components, purchased parts and assembly. Your assembly drawing, parts list and usage requirements determine what must be delivered.
In China we can combine almost all metal and plastic processing with assembly and many different surface treatments. This offers ample opportunities to have various parts made into one complete assembly.
We discuss in advance which connections, adjustments and checks are part of the order. Trial assembly, product identification and packaging are also included. You have one Dutch point of contact for coordination with the production partner and for subsequent orders.

Coordinate parts, quantities and revisions.

Manufactured parts and standard components in one planning.

Assess fit and function before series.

Record working methods and checkpoints.

Technical coordination and delivery via TOS.
A part can conform to its own drawing and still cause problems during assembly. Consider holes that do not align properly, a coating on a fitting surface or insufficient space for tools. That is why TOS assesses the connection between the parts before the series is built up.
Determine the delivery limit. Do you want a pre-assembled module, a complete mechanical product or a set that you further assemble yourself? Also describe what the receiver still needs to be adjusted, connected or checked. This way, the quotation and the release have the same meaning.
Many assembly options by combining operations. Through our production network in China we can carry out almost all metal and plastic operations, including many different surface treatments. This means that parts from various production processes can be delivered together as an assembled module or complete product.
For example, an extruded aluminum profile can be assembled with a casting part, a CNC machining part and plastic components. Also plastic injection molding, sheet metal and standard fasteners can also be part of the same composition. We coordinate production, surface treatment and installation. For welding constructions with finishing and coating the order of welding, processing, finishing and assembly is also part of the overall plan.
The general options are on our page about industrial assembly. For an assignment in China, we also pay attention to the availability of all components, repeatable work instructions and the desired delivery form to the Netherlands.
A parts list makes visible what is actually needed. Enter the item number, revision, quantity and prescribed version per position. Record which parts are made new, which are supplied as purchased parts and which you supply yourself. For a prescribed brand or type, replacement is only possible after your approval.
Compression, pop rivets and bolts are also possible. Parts can be joined with a press connection, connected with pop rivets or mounted with nuts and bolts. We tailor the connection method to the materials, function and desired design of your product.
Match the connection to the function. For bolts and nuts, strength class, security and a prescribed tightening torque may be relevant. For pins, bushes and bearings, fit, mounting direction and damage-free mounting are points of attention. Specify such requirements on the drawing or in the assembly instructions.
Also check the influence of surface treatment. For example, a coating may not unintentionally render a screw thread or contact surface unusable. Discuss shielding, dimensional inspection and the order of finishing and assembly before ordering parts.
Use the test assembly to resolve any ambiguities. Record approved changes in the parts list and drawings, so that the next series is made according to the same version.

Collect drawing, parts list and usage requirements.

Determine parts, connections and delivery limits.

Check fit, function and instructions.

Work according to the released version.

Agree on inspection, packaging and repeat orders.
Assess the first complete product based on what it should do. Only measuring individual parts is insufficient. Depending on the application, for example, freedom of movement, connection to a counterpart, operating force or the operation of a lock can be checked. The test method and acceptance limits must be known in advance.
Indicate which measuring equipment, reference parts or accessories are required. A test with load requires agreements about the load, setup, duration and assessment. TOS incorporates the desired inspection into the project; a specific test or certification is not automatically assumed.
Discuss the quality inspection per phase: receipt of components, interim assembly check and final inspection. measurement reports can be agreed for critical connection dimensions. Make a distinction between checks on each product and checks according to an agreed sample.
After the test assembly, you record which version has been released. An approved reference product, photos and short work instructions can help. In the event of a change in part, material, supplier or mounting method, it will be reviewed which check is required again.
Compare the costs of a complete delivery. In addition to assembly, components, tools, inspection, failure, packaging and transport count. A lower assembly time alone does not prove that the entire route is cheaper.
Delivery completely assembled or partially disassembled? A complete product can be further processed immediately upon receipt, but sometimes takes up more transport space. Partial assembly can save space and requires additional actions on your part. Record who carries out the final assembly and which parts, fasteners and instructions are included.
Vulnerable surfaces, moving parts and protruding connections require appropriate protection. Agree on placement in a crate or box, intermediate layers, product identification and quantities per package. During the first delivery, also check whether the product is still usable after transport.
For repeat orders, parts and revisions must continue to correspond. Discuss delivery times of purchased parts, order sizes and any spare parts. The supply can be tailored to your needs via supply chain coordination; a stock position in the Netherlands is possible if this has been agreed separately.
View the overview of outsource production to China for the associated operations. Please include your assembly drawing, parts list, expected purchase quantity and desired delivery form for an initial assessment.
Describe the module or end product and what you still do yourself. Provide an assembly drawing, parts list, expected purchase and desired delivery dates.
Record article number, version, quantity and revision per component. Agree on how changes will be communicated and who will assess deviations.
Determine which parts are made, purchased or supplied by you. Confirm prescribed brands, replacement rules and availability before ordering.
Assess accessibility, orientation, connections and the order of finishing and assembly. Include required assembly tools and work instructions in the order.
Name critical dimensions and functions, the test setup and acceptance limits. Make it clear which checks take place per product or according to a sample.
Build the agreed test products and check the connection of the parts. Record bottlenecks, necessary adjustments and any damage.
Assess the test assembly with the agreed checkpoints. Include approved corrections in drawings, parts list and assembly instructions before the series begins.
Work with the released parts and assembly sequence. Make agreements about interim inspections, handling of deviations and recognisability of the product revision.
Check completeness, implementation and the agreed functions. Pack vulnerable parts with appropriate protection and include agreed identification and reporting.
Coordinate transport, receipt and any final installation with you. Record improvement points from the first delivery and confirm the correct revision for a repeat order.
An assembly drawing, parts list, parts data, expected purchase and desired delivery form form the starting point. Add critical functions, inspection requirements, prescribed purchasing parts and packaging requirements. Indicate which parts you supply yourself.
This can be included in the application. For each part it is determined whether it is produced, purchased or supplied by you. A prescribed brand or type will not be replaced without your agreement.
A inspection and test plan will be agreed for this purpose. A trial assembly can reveal fit, movement and operation. The method, acceptance limits and any measurement reporting are tailored to your product.
This must be reviewed per project. In addition to assembly costs, parts, preparation, inspection, packaging, transport volume and any final assembly in the Netherlands count. Compare quotes with the same delivery limit.
Yes, partial assembly can be discussed, for example to limit transport space. Record which actions are still required upon receipt and which parts, fasteners and instructions are included.