Improve an existing component

Product optimisation for practical manufacturing

Product optimisation starts with a part that needs to perform better in production. Perhaps machining removes too much material, a welded assembly takes too long to build, or an expensive tolerance adds little value. TOS reviews the existing design against its function, production volume and delivered cost.

We use your current drawing, material specification and production experience as a baseline. The review separates essential requirements from details that may be changed. Any proposal must preserve the agreed interfaces, operating requirements and acceptance criteria.

This service focuses on improving an existing solution. For a new component that still needs a digital definition, see 3D CAD design. For a physical model to answer a specific development question, see prototyping and 3D printing.

What the optimisation review considers

Function retained

Keep critical interfaces and acceptance requirements visible.

Route comparison

Assess tooling and operations across the complete process.

Material review

Consider application requirements before substitution.

Controlled revision

Record approved changes in the model and drawing.

Validation plan

Check the revised parts before repeat production.

Compare manufacturing routes against the same requirements

A different process is useful only when the complete route makes sense. A machined part might be a candidate for a cast or forged blank with finished interfaces. A welded construction might be simplified by combining features. A constant cross-section might suit aluminium extrusion followed by cutting and machining. These are options to investigate, rather than automatic improvements.

Compare tooling, setup, minimum order quantities, machining, finishing, inspection and transport. Expected repeat demand matters: a dedicated tool can be difficult to justify for a small or frequently changing requirement. TOS discusses the assumptions behind each route with the production partner.

For example, replacing a part machined from solid with a near-net-shape blank may reduce machining while introducing tooling and additional dimensional considerations. CNC machining, sand casting and metal forging have different design constraints. The comparison must include the operations needed to reach the finished specification.

We record the proposed changes before the drawing is revised. A product change is not released solely because a supplier quotes a lower price.

Review and validation

From current design to an approved improvement

Define a measurable objective, compare realistic alternatives and verify the selected revision before committing to repeat production.

1. Establish the baseline

Collect the current drawing, material, quantities and manufacturing issues.

2. Identify opportunities

Review geometry, tolerances, material use and assembly effort.

3. Compare alternatives

Assess feasible process routes and the complete cost assumptions.

4. Verify revised parts

Agree samples, fit checks and dimensional verification.

5. Release the revision

Record approval and update the production documentation.

Validate the change before it becomes the production standard

Material selection, wall thickness, radii and tolerances must be assessed in the context of use. A lighter material is not automatically an equivalent substitute. Keep load, corrosion exposure, joining, surface treatment and service conditions in the review. Any necessary calculations or tests are agreed as part of the project.

Use a clear before-and-after comparison. Record the current revision, proposed geometry, manufacturing route and expected effect. Identify whether samples, assembly trials or additional inspections are needed. If a change affects a mating component, that interface belongs in the validation plan.

Once a proposal is approved, update the drawing, model and associated requirements together. Dimensional inspection reports can document agreed features of the first revised parts; broader process checks belong in the quality-control plan.

What should I send for a review?

Send the existing drawing or model, material, annual and batch quantities, critical functions and the problem you want to resolve. If available, include current manufacturing steps, recurring defects or assembly feedback. TOS can then define a focused review rather than an open-ended redesign.

Are cost savings guaranteed?

No fixed saving applies to every part. The result depends on feasible changes, production volume and the full supply route. Keep the comparison tied to an agreed specification and confirm any improvement with appropriate samples and checks.