First assess, then produce · Check before series and before shipment

First article inspection and final inspection in China

An approved example provides direction for the series. A final inspection shows the condition of the batch before shipment. With first article inspection and final inspection in China TOS connects these two moments with your product requirements.

Before the series starts, we check together whether the sample meets your expectations. What can be improved further, we include in production. We often have an example flown in first, so that we can view it ourselves and assess it with you.

Ruwheidsmeting op een bewerkt metalen trekoog bij productcontrole in China

What do you want to know before production and delivery?

A tangible example

Assess execution and fit together before the series starts.

Clear product requirements

The current drawing and agreed features as a starting point.

Customized inspection

Coordinate inspection scope and any AQL approach in advance.

Record release

Record findings, corrections and approval in a recognizable manner.

Protected delivery

Include packaging and identification before shipment.

Aanvullende controle van een metalen gietdeel met draagbare meetapparatuur

First an example in hand

Everything can be correct on a drawing, but a real product tells more. Does the operation feel good? Do the parts fit together neatly? And does the finish match what you had in mind? Especially with a new product, it is nice to view it before a complete series.

Would you like to have something in your hands sooner? TOS can 3D print in-house to create a tangible model. This allows us, for example, to view the shape, dimensions and connection to other parts before the first production example from China arrives. Read more about our options for 3D printing and prototyping. A printed model helps with design assessment; A suitable production example remains necessary to assess the final material, the finish and the production method.

That is why we often first have a sample made and flown to the Netherlands. We will look at it ourselves and discuss it with you. Where necessary, you can evaluate the product in your own application or try it with a counterpart. We agree on which checks take place at TOS and what you want to test yourself.

The origin of the example is important. A handmade prototype may show something different than a first product from the intended mold or production setup. We record which implementation is reviewed and which steps, such as coating or assembly, still need to follow.

During a first article check, we compare the product with the current drawing, specifications and agreed features. This could be dimensions and fit, but also material data, mounting, visible surfaces, color or marking. We will agree with you in advance which points will be recorded.

With plastic injection molding, for example, this may involve closing a housing. When assembly in China, connections and the operation of the complete assembly also deserve attention. We include an additional material or product test if the application requires it and we have agreed.

Findings must be reflected in the production agreements. We discuss necessary corrections, confirm the correct revision and record the release for the series. If an adjustment affects other features, we’ll review it. This makes it clear what exactly has been approved.

Diametercontrole van een bewerkt metalen gietdeel met een buitenmicrometer bij eindinspectie in China

From example to release in 5 steps

1. Select inspection points

Determine what is reviewed for the example and for the game.

2. Discuss example

We often have a product flown in for assessment with you.

3. Series release

Process corrections and confirm the agreed implementation.

4. Inspect batch

Check the ready products and delivery form.

5. Reconcile shipping

Complete outstanding items, reporting and packaging.

Final inspection before departure from China

When production is ready, we want to know whether the batch meets the agreements made. During a final inspection in China, we therefore look at the selected checkpoints and the form of delivery. Has the correct version been produced? Are the agreed components present? And are products and packaging recognisable?

Depending on your product, we can assess dimensions, assembly, visible finish, damage, markings and packaging, among other things. We coordinate how quantities and composition of the delivery are checked. Extensive function tests or specialist examinations are only part of the inspection if these have been agreed in advance.

For measuring points and registration, measurement inspection and measurement reports in China is linked to this. We deal with the inspection of incoming materials and purchased parts at material and entry inspection. Together, these agreements form the basis for targeted inspection during the production process.

Agree clearly, assess carefully

AQL, anomalies and protection along the way

TOS is familiar with AQL procedures for sample checks. If this approach suits your product, we will agree in advance on the inspection level, the AQL values ​​and the classification of deviations. The batch size and the chosen sampling plan determine the sample size and the acceptance and rejection limits.

A sample means that selected products are examined. This means that not every product has been checked individually. For features that need to be looked at on each product, we can agree on a targeted 100% check. Together we determine which approach suits the function and risks of the component.

Is there a deviation? We then record which products and features are involved. We discuss the possible next step, such as sorting, repairing, replacing or re-inspection. We will explicitly agree with you on any acceptance of a deviation. Outstanding points are part of the decision regarding release for shipment.

The packaging also deserves this attention. A correctly manufactured part can be damaged in transit if it shifts or rubs against another part. We therefore discuss the protection of visible surfaces, fitting surfaces and screw threads, the layout of boxes or crates and the required recognisability. We tailor the chosen packaging to the product and the planned transport.

After the agreed checks, we record the findings and release. Where agreed, you will receive measurement data, photos or an inspection overview. Also view our general quality inspection and how TOS guides outsourcing production to China.

We review the current drawing and specifications. The desired finish, composition and delivery form are also part of the agreements.

We determine which features are reviewed for the first product. We will discuss whether an example is necessary in the Netherlands and which checks you want to carry out yourself.

The example is made according to the agreed implementation. We often have it come to the Netherlands by plane, so that it can be viewed before batch production.

TOS looks at the example and discusses it with you. Dimensions, fit, finish or operation are reviewed within the agreed scope of inspection.

We record comments and necessary changes. After the agreed corrections and assessment, we will confirm which version has been released for the series.

We coordinate the checkpoints and scope of the final inspection. At AQL we record, among other things, the inspection level, the AQL values and the classification of deviations.

The selected products are checked for the agreed characteristics. We also look at the correct implementation and the agreed composition of the delivery.

Deviations are clearly recorded and discussed. After sorting, repair or replacement, we check the relevant points again as agreed.

We look at the agreed protection and layout of the packaging. Product and batch information must match the delivery and associated documents.

We complete the agreed registration and coordinate outstanding points with you. The release for shipment is clearly recorded.

Frequently asked questions about first article inspection and final inspection in China

What is the difference between first article inspection and final inspection?

In a first article check, we assess an initial product before the series is released. A final inspection takes place on the ready batch before shipment. The checkpoints and size may vary from time to time.

Often yes, especially if it is nice to assess the execution, fit or finish in your hands. We will discuss in advance whether this is necessary for your product and who carries out which checks. A large or special product may require a different approach.

Yes, TOS is familiar with AQL procedures. If an AQL sample is appropriate, we agree on the inspection level, AQL values ​​and deviation classification. The chosen plan determines the sample size and acceptance and rejection limits based on the batch size.

That depends on the agreed scope of audit. A sample assesses selected products. A 100% inspection can be agreed for certain characteristics, but does not mean that all possible properties of every product have been examined.

We record which products and features are involved and discuss the next step. Consider sorting, repairing, replacing or re-inspection. Any deviation acceptance and release for shipment are explicitly coordinated.